Snapshot before the quality program (relevance gates, tiered mapping, QA linter). v1 is the immutable before/after reference; evidence crawl was at ~175/3039 occupations when tagged. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01PDKeXvpT6tENSvyQGLV1Uq
2.6 KiB
2.6 KiB
Tasks & work activities — carpet fitter
Source: O*NET 30.3, occupation 47-2041.00 (Carpet Installers).
Task statements
- [Core] Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.
- [Core] Join edges of carpet and seam edges where necessary, by sewing or by using tape with glue and heated carpet iron.
- [Core] Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.
- [Core] Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.
- [Core] Roll out, measure, mark, and cut carpeting to size with a carpet knife, following floor sketches and allowing extra carpet for final fitting.
- [Core] Plan the layout of the carpet, allowing for expected traffic patterns and placing seams for best appearance and longest wear.
- [Core] Stretch carpet to align with walls and ensure a smooth surface, and press carpet in place over tack strips or use staples, tape, tacks or glue to hold carpet in place.
- [Core] Take measurements and study floor sketches to calculate the area to be carpeted and the amount of material needed.
- [Core] Cut carpet padding to size and install padding, following prescribed method.
- [Core] Install carpet on some floors using adhesive, following prescribed method.
- [Core] Nail tack strips around area to be carpeted or use old strips to attach edges of new carpet.
- [Core] Fasten metal treads across door openings or where carpet meets flooring to hold carpet in place.
- [Core] Measure, cut and install tackless strips along the baseboard or wall.
- [Core] Draw building diagrams and record dimensions.
- [Core] Move furniture from area to be carpeted and remove old carpet and padding.
- [Core] Cut and bind material.
Detailed work activities
- Clean work sites.
- Create construction or installation diagrams.
- Cut carpet, vinyl or other flexible materials.
- Estimate materials requirements for projects.
- Inspect work sites to determine condition or necessary repairs.
- Install carpet or flooring.
- Mark reference points on construction materials.
- Measure materials or objects for installation or assembly.
- Measure work site dimensions.
- Plan layout of construction, installation, or repairs.
- Prepare surfaces for finishing.
- Remove worn, damaged or outdated materials from work areas.
- Review blueprints or specifications to determine work requirements.
- Smooth surfaces with abrasive materials or tools.