Snapshot before the quality program (relevance gates, tiered mapping, QA linter). v1 is the immutable before/after reference; evidence crawl was at ~175/3039 occupations when tagged. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01PDKeXvpT6tENSvyQGLV1Uq
3.0 KiB
3.0 KiB
Tasks & work activities — paperhanger
Source: O*NET 30.3, occupation 47-2142.00 (Paperhangers).
Task statements
- [Core] Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- [Core] Trim rough edges from strips, using straightedges and trimming knives.
- [Core] Trim excess material at ceilings or baseboards, using knives.
- [Core] Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- [Core] Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- [Core] Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- [Core] Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- [Core] Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- [Core] Place strips or sections of paper on surfaces, aligning section edges and patterns.
- [Core] Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- [Core] Measure surfaces or review work orders to estimate the quantities of materials needed.
- [Core] Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- [Core] Smooth rough spots on walls and ceilings, using sandpaper.
- [Core] Set up equipment, such as pasteboards and scaffolds.
- [Core] Remove old paper, using water, steam machines, or solvents and scrapers.
- [Core] Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- [Core] Mix paste, using paste powder and water, and brush paste onto surfaces.
- [Supplemental] Staple or tack advertising posters onto fences, walls, billboards, or poles.
- [Supplemental] Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- [Supplemental] Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
Detailed work activities
- Apply adhesives to construction materials.
- Apply decorative or textured finishes or coverings.
- Apply material to fill gaps in surfaces.
- Apply sealants or other protective coatings.
- Assemble temporary equipment or structures.
- Clean surfaces in preparation for work activities.
- Cut carpet, vinyl or other flexible materials.
- Estimate materials requirements for projects.
- Implement advertising or marketing initiatives.
- Inspect completed work to ensure proper installation.
- Mark reference points on construction materials.
- Measure materials or objects for installation or assembly.
- Measure work site dimensions.
- Mix substances or compounds needed for work activities.
- Prepare surfaces for finishing.
- Remove worn, damaged or outdated materials from work areas.
- Review blueprints or specifications to determine work requirements.
- Smooth surfaces with abrasive materials or tools.
- Trim excess material from installations.